Copthorne Recreation Ground MUGA Project - Phase 2
Worth Parish Council (South East) · tender awarded · winner: WARWICK LANDSCAPING LIMITED
- Buyer
- Worth Parish Council
- Region
- South East
- Published
- 10 August 2026
- Procedure
- Below threshold - limited competition
- Notice
- 075774-2026
Description
Phase 2 - MUGA Installation Installation of a Multi-Use Games Area, including: - Preliminaries - Excavation & Foundations - Base Construction - Perimeter Fencing - Floodlighting - Paths - Hard & Soft Landscaping - Handover The works shall be carried out in accordance with the requirements of the specifications within this Schedule of Works and the contract documents. In the event of discepancy the Schedule of Works shall take precedence. Quantities stated within this Schedule can be relied upon by the contractor. All volumes stated are unbulked. Tenders should be based on the details included in the following document bundle: a. Sky Revolutions drawing reference SRL221552 [Topographical Survey] b. PBA Planning drawing reference WPC-CP-01 REV C [Existing layout plan] c. PBA Planning drawing reference WPC-CP-05 [External works plan] d. PBA Planning drawing reference WPC-CP-06 [Cross Sections - 200mm excavation] e. PBA Planning drawing reference WPC-CP-07 [Cross Sections - 500mm excavation] f. PJC document reference PJC/6393/24-02 [Arboricultural impact assessment, method statement and tree protection plan] g. WPC-CP-CEMP [Construction Environment and Management Plan] h. Pluviam drawing reference PN0237-PEL-XX-XX-DR-Y-0001 B [Drainage Plan] i. Zaun Super Rebound 8 Information Sheet - Version 20220817 [Perimeter Fence Specification] j. Jakoustic Reflective Fencing Information Sheet - JSW 30 Issue 02 [Acoustic Fence Speification] k. Philips Lighting Design dated 18th July 2024 l. BEI Lighting drawing reference 28670-1 [Floodlighting columns] m. Philips Lighting Optivision LED gen3.5 Information Sheet [Datasheet 2026 January 10]. All references to "the tree protection plan" shall mean PJC document reference PJC/6393/24-02. All references to offsite disposal shall be understood to mean disposal at a registered waste transfer station at the Contractors expense. Duty of Care waste transfer notes will be made available for inspection by the Project Manager or Client upon req…
Award
- WARWICK LANDSCAPING LIMITED
- WARWICK LANDSCAPING LIMITED · £109,516