GL1 Leisure Centre Contract 2 and Stage 3 Design
Gloucester City Council (South West) · tender awarded · winner: E G Carter & Co Ltd
- Buyer
- Gloucester City Council
- Region
- South West
- Published
- 16 September 2026
- Procedure
- Below threshold - limited competition
- Notice
- 087684-2026
Description
See attached contract for details. Progressing Design from RIBA Stage 3 to RIBA Stage 4 1.1. Appoint and lead the Design Team a) Employ Design Consultants: Engage key consultants such as architects, structural engineers, MEP engineers, and other necessary specialists to complete the Technical Design, for manufacturing and construction stage (RIBA 4). b) Design Coordination: Lead design workshops and meetings to ensure integrated design solutions across disciplines. c) Design Management: Manage the design process, ensuring all parties adhere to the design brief, project scope, and cost parameters. d) Review and Sign-off: Regularly review design progress with the Project Manager and ensure all design outputs meet project requirements before sign-off at the end of RIBA Stage 4. 1.2. Technical Design Development a) Technical Design Development: Progress the design to RIBA Stage 4, including detailed specifications, construction details, and schedules for all building elements. b) Value Engineering: Collaborate with the design team and Employer to refine the design, ensuring it aligns with budget constraints while meeting quality and performance standards. c) Building Control: Ensure designs are co-ordinated and with Building Control requirements. Ensure that the design complies with Building Regulations and engage with Building Control as needed to obtain all necessary approvals. 1.3. Design Input a) Providing advice on requirements for off-site design, temporary works and manufactured components. b) Providing advice on all aspects of "buildability" in relation to the proposed design and on the feasibility of construction interfaces and tolerances and suggesting any construction changes which could be used to reduce the incidence of conflicts or difficult interfaces between different elements of a single package of work or between different packages of work. c) Through the design development process, developing a "Contractor's Proposals" document that satisfies the Emp…
Award
- E G Carter & Co Ltd · £144,401