Recreation Ground Pavilion Upgrade of Toilets, Showers and Hot Water System
Trawden Forest Parish Council (North West) · value £40,000 · tender bids by 18 December 2026
- Buyer
- Trawden Forest Parish Council
- Region
- North West
- Estimated value
- £40,000
- Published
- 18 November 2026
- Bid deadline
- 18 December 2026
- Procedure
- Below threshold - open competition
- CPV
- 45000000
Description
The successful contractor shall provide all labour, materials, plant, equipment, supervision, and waste disposal necessary to complete the works described below. Plumbing and Hot Water Systems • Remove and responsibly dispose of the existing hot water cylinder. • Supply and install a new energy-efficient hot water system suitable for the building's intended use and occupancy levels. • All plumbing works shall comply with current Building Regulations and Water Regulations. • Contractor to recommend and specify the most appropriate replacement system within their tender submission. Shower Facilities • Remove all existing shower installations. • Supply and install individual showers within separate shower cubicles. • Complete all associated plumbing, drainage and electrical works. • Ensure adequate ventilation is maintained or upgraded as required. Toilet Refurbishment • Remove all existing sanitaryware and associated fittings. • Supply and install new WC suites, wash hand basins, taps and accessories. • Layout shall follow the design and arrangement shown on the drawings supplied by the Council. • Include necessary alterations to drainage, water supply and waste connections. • All facilities must comply with current accessibility requirements where applicable. Entrance Area Alterations • Carefully demolish and remove internal partition walls within the entrance area as indicated on the drawings. • Create an open-plan social area. • Make good all affected surfaces including ceilings, walls and floors. • Undertake any necessary structural works identified during the contractor's investigations. • Contractor shall verify wall construction prior to commencement and provide any required structural calculations. Flooring Works • Remove existing floor finishes within all shower, toilet and bathroom areas. • Prepare subfloors as required. • Supply and install new slip-resistant commercial-grade flooring suitable for wet environments. • All junctions, trims and finishes to be…