QDNL Innovation Impact Challenge: Quantum solutions for Water, Infra and Energy
Ministerie van Economische Zaken en Klimaat, Rijksdienst voor Ondernemend Nederland (RVO) · Groningen · Open · inschrijven tot 25 januari 2027, 17:00
- Aanbestedende dienst
- Ministerie van Economische Zaken en Klimaat, Rijksdienst voor Ondernemend Nederland (RVO)
- Provincie
- Groningen
- Status
- Open
- Sluitingsdatum
- 25 januari 2027, 17:00
- Gepubliceerd
- 2 november 2026
- Geraamde waarde
- niet gepubliceerd
- CPV
- 73100000 · Onderzoek en ontwikkeling, en aanverwante adviezen
- Procedure
- Openbare procedure
- Aankondiging
- 447323
- Aanbestedingsstukken
- 1
Beschrijving
The Ministry of Infrastructure and Water (MinI&W) and The Ministry of Economic Affairs and Climate (MinEZK) invite the quantum ecosystem in the Netherlands to develop quantum-enabled solutions for challenges in the field of (digital) Infrastructure, Water and Energy. The MinI&W is responsible for Water and Infrastructure policy in the Netherlands. MinEZK funds QDNL, the national initiative orchestrating the development of sustainable economic growth in the Netherlands through quantum technology. In the context of this challenge, the MinEZK is also responsible for Digital Infrastructure and Energy policy in the Netherlands. The available Phase 1 budgets per CAT are: • CAT 1 – Quantum Computing & Simulation €600,000 including VAT • CAT 2 – Quantum Communication & Networks €800,000 including VAT • CAT 3 – Quantum Sensing €600,000 including VAT The maximum budget per Phase 1 feasibility study is €200,000 including VAT. For Phase 2, a budget of up to €1.5 million including VAT per CAT is available. The maximum budget per Phase 2 project is €1.5 million including VAT. The number of contracts awarded in each phase depends on the quality and combined price of the highest-ranked proposals and the available budget. Any budget remaining from Phase 1 may be transferred to Phase 2 within the same CAT. If insufficient proposals of sufficient quality are received, the available budget may not be fully allocated.